Follow Us
Calendar
October 2024 S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
This assignment involved the design of a new CAT III 8,800-foot runway, full parallel taxiway, five connecting taxiways, a 46,000-square-yard terminal apron, a 98,200-square-yard air cargo apron, and a perimeter roadway around the entire site. Per the EIS, the project included construction of water quality and storm water detention basins strategically located around the airfield to collect the first 0.5 inch of rainfall from all paved surfaces.
The assignment also involved a new electrical vault, primary and secondary power, edge, centerline, and touchdown zone lighting.